MISO and PJM Joint U.S. study to implement the Clean Power Plan with PLEXOS.

Mid-continent Independent System Operator (MISO) and PJM Interconnection have completed a joint study using PLEXOS for the implementation of the Clean Power Plan (CPP).

The CPP has indeed created a need for detailed emissions modelling by many other entities using PLEXOS as part of their long-term planning.

THE KEY INSIGHTS from the study are:

  1. The variation in gas prices and state policies are as important as CPP rules.
  2. The standardisation of energy efficiency across states equals savings.